EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
ToddsCH650B
-
Listing for Category : rudder
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (92)
Elevator
- (8)
Engine
- (4)
Firewall
- (6)
CabinFloor
- (6)
-
Reassemble
-
Disassemble, Debur,...
-
Final Hole Drilling
-
Rudder Pedals
-
Started
-
Started
H-Stabilizer
- (10)
LeftAileron
- (4)
LeftWingFlap
- (3)
LtRrFuseSide
- (6)
RearFuselage
- (11)
RearLowrFuse
- (13)
RghtWingFlap
- (4)
RightAileron
- (3)
RtRrFuseSide
- (6)
Rudder
- (7)
None
- (1)
Builder Name:
Todd Osborne
-
Project:
Zenair - CH 650 B
-
VIEW REPORTS
Total Hours:
231
Start/Last Date:
Nov 18, 2017 - Dec 20, 2020
Engine:
Corvair
Propeller:
TBD
Panel:
GlassPack (Custom)
Friendly URL:
https://eaabuilderslog.org?s=ToddsCH650B
Home or Last Project Picture
Jun 24, 2018
Completed
- (3 hours)
Category: Rudder
Installed new nose skin and top rib, plus AlumiPrep, Alodine, and Zinc Phosphate
0001.jpg
0002.jpg
Jun 16, 2018
Corrected Mistake
- (1 hour)
Category: Rudder
Removed nose skin to replace and add tip bracket
Apr 21, 2018
Corrosion Protection and Final Assembly
- (4 hours)
Category: Rudder
0001.jpg
0002.jpg
0003.jpg
0004.jpg
0005.jpg
Mar 04, 2018
Deburring
- (1 hour)
Category: Rudder
Deburring and prep for final assembly
Feb 25, 2018
Started nose skin
- (3 hours)
Category: Rudder
Finished drilling skeleton, fit and drilled nose skin
Dec 02, 2017
Assembly
- (6 hours)
Category: Rudder
Alumiprep 33 and Alodine 1201 rudder skeleton. Riveted skeleton. Almost done skinning one side.
0002.jpg
0003.jpg
Nov 18, 2017
Tail kit inventory and Rudder Spar and Rib Drilling
- (3 hours)
Category: Rudder
0001.jpg
0002.jpg
0003.jpg
0004.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.